Abstract | ||
---|---|---|
The paper deals with power system topology verification with use of multiagent systems. Two such multiagent systems are considered. The assumed idea allows considering a topology verification of a whole power system as the set of many local topology verification processes. Each of the described multiagent systems performs the topology verification using a different protocol. For each of the multiagent systems, analysis and design are outlined using the Multiagent Systems Engineering. For their design models, probabilistic performance evaluation has been carried out. Then, a comparison of the investigated multiagent systems is made, paying special attention to their performance effectiveness. |
Year | DOI | Venue |
---|---|---|
2010 | 10.1007/978-3-642-13480-7_45 | KES-AMSTA (1) |
Keywords | Field | DocType |
design model,topology verification,whole power system,multiagent systems engineering,power system topology verification,performance effectiveness,local topology verification process,multiagent system,probabilistic performance evaluation,assumed idea,probabilistic method,power system | Functional verification,Power system topology,Computer science,Interaction protocol,Electric power system,Multi-agent system,Probabilistic logic,Distributed computing | Conference |
Volume | ISSN | ISBN |
6070 | 0302-9743 | 3-642-13479-3 |
Citations | PageRank | References |
0 | 0.34 | 8 |
Authors | ||
4 |
Name | Order | Citations | PageRank |
---|---|---|---|
Kazimierz Wilkosz | 1 | 16 | 3.29 |
Zofia Kruczkiewicz | 2 | 15 | 3.15 |
Tomasz Babczyński | 3 | 17 | 3.88 |
Wojciech Penar | 4 | 9 | 1.30 |